Date |
Line |
|
Notes |
10-05-2023 | 1 | | MNGR/UPDATE FIN AREA + HEAT & AC IN SUITES 14 & 16 F'24 |
02-10-2023 | 1 | | ALT IN PROGRESS/NCIV F'23 |
10-05-2021 | 1 | | INSTALLATION OF BOOTH COMP F'22 |
09-15-2020 | 1 | | MINOR INT ALT TO SUITE 20B COMP/NCIV F'21 |
01-15-2020 | 1 | | NO CONST F'20 |
08-16-2017 | 1 | | new tpo roofing system permit# 141698/cost $30,693/nciv f'18 |
03-15-2017 | 1 | | paint room comp/nciv f'17 |
10-07-2014 | 1 | | RETROFIT TO SUITE 14C, ON CD1, COMP/NCIV F15 |
11-29-2012 | 1 | | ROOF REPAIRED FOR 2013 PER PERMIT 101761/COST $100,000/NCIV |
07-05-2012 | 1 | | ALTERATION TO STAGE AREA FOR 2013 PER PERMIT 97243, COST |
07-05-2012 | 2 | | $25,000/NCIV |
08-08-2011 | 1 | | minor int alt in suite 21 comp per permit#90203 cost $4000/ nciv |
03-08-2010 | 1 | | retrofit in suite 20a & 21 comp/nciv f |
02-13-2008 | 1 | | chg cd 4 from 10% finish to full finish semi f08 |
10-25-2006 | 1 | | CORRECTED GROSS SQ FT FROM 123,480 TO 119,240 PER FIELD CHECK BY |
10-25-2006 | 2 | | LIZ WHITACRE (indicated incorrect by appraisal attached) |
06-21-2006 | 1 | | 3/8/2006
1. combined 1714.05-07-8627 (0229555)here with |
06-21-2006 | 2 | | 1704.12-97-6210(0020034)per bm2005-1557 & city of raleigh |
06-21-2006 | 3 | | request
2. split 9.32ac here to 1714.12-07-4591(0341359)per |
06-21-2006 | 4 | | bm2005-1557/moved bldgs from here(old card #)2,3,8 and 9 to |
06-21-2006 | 5 | | id0341359
3. acreage correction (8.55ac)per bm2005-1557 |
06-21-2006 | 1 | | 5-23-94/DCO ADDED 9,925 SQ FT OF UPFIT W/CENT H&A FOR SUITES |
06-21-2006 | 2 | | 14A, B & C - 100% COMP F94 |
06-21-2006 | 3 | | 13224 SF INT FIN & ADDED EXIST A/C NCIV FOR 88/DO |
06-21-2006 | 4 | | PARRISH TIRE ET AL |
06-21-2006 | 1 | | 7-29-2005 SP = $5,200,000 (INCLUDES ID0020034 & ID0229555) |
06-21-2006 | 2 | | nothing demolished |
06-21-2006 | 3 | | LAND COND N FOR ACCESS |
06-21-2006 | 4 | | 2-19-97/PW/(1.75A)SPLIT OUT HERE FROM #20034 F98/MWR |
06-21-2006 | 5 | | 7-29-2005 SP = $5,200,000 (INCLUDES ID0020034 & ID0229555) |
06-21-2006 | 6 | | APPEAL BY LETTER 1-31-96/RAD |
06-21-2006 | 7 | | 1-9-87/GG ADD SALES OFFICE FOR 87 |
06-21-2006 | 8 | | 1-18-05/GKW/NO DEMO F2005 |
06-21-2006 | 9 | | 1-22-03/GKW/NO DEMO F2003 |
06-21-2006 | 10 | | 1-12-04/GKW/NO DEMO F2004 |
06-21-2006 | 11 | | APPEAL FORM MAILED 02-09-96/ACO |
06-21-2006 | 12 | | 2-19-97/PW/(20.43A)S/O 3.05A TO #229539 & 1.75A TO 229555 |
06-21-2006 | 13 | | ACREAGE CORR PER BM96-1236 F98/MWR 6-26-97/ALTON SMITH, JR/DCO |
06-21-2006 | 14 | | REPLACED EXISTING HVAC SYSTEMS F97- (NCIV)-LISTED BY 1997 B-1 |
06-21-2006 | 15 | | COST: $23,662 |
06-21-2006 | 16 | | 4-4-96/KWM NO CHANGE BY BOARD OF E & R F96 |
06-21-2006 | 17 | | .04AC TO R/W F94/DCO |
06-21-2006 | 18 | | 2-21-96/PW(19.46AC)ACREAGE CORR PER DB6830-0001 F97/MWR |
06-21-2006 | 19 | | IMPS LISTED ON 1994 B-1/JSD |
06-21-2006 | 20 | | 4-29-91/PER B-1 LISTING/GHG/ADD PAVING ON CARD# (2 OF 9) FOR 91 |
06-21-2006 | 21 | | IMPS LISTED ON 1994 B-1"RALEIGH BONDED WHSE"5-23-94/DCO ADD |
06-21-2006 | 22 | | UPFIT TO BLDG (CD#4)-100% COMP F94 |